DOI 10.1007/s40199-026-00661-7
Important potential risks not reflected in Japanese drug labeling: implications for risk management plan termination.
Аннотация
BACKGROUND
Risk management plans (RMPs) support lifecycle management of drug-related risks. In Japan, however, their use in clinical practice remains limited, and healthcare professionals often rely on the package insert for safety information. After RMP termination at re-examination, healthcare professionals may no longer readily identify unresolved risks absent from the package insert through either the package insert or the Pharmaceuticals and Medical Devices Agency (PMDA) RMP source.
OBJECTIVES
We investigated the extent to which important potential risks in RMPs are reflected in the package insert and considered the implications of RMP termination when such risks remain undocumented.
METHODS
We analyzed RMPs publicly available as of May 2023 using data from the PMDA website. For each important potential risk, we examined whether it was documented in the package insert and summarized the results descriptively by risk type.
RESULTS
Among 772 important potential risks in 330 RMPs, 134 (17.4%) were not documented in the package insert. Non-documentation proportions were relatively high for "Infections and infestations" (32.7%), "Gastrointestinal disorders" (32.4%), and "Neoplasms benign, malignant and unspecified (incl cysts and polyps)" (28.4%), whereas a relatively low proportion was observed for "Vascular disorders" (2.3%).
CONCLUSION
Some important potential risks in active Japanese RMPs were not documented in the package insert. This may create gaps in risk communication after RMP termination, although clinical outcomes and patient harm were not assessed. Allowing RMP continuation beyond re-examination when necessary may help maintain awareness of unresolved safety concerns.
Предметные рубрики MeSH
Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Ошибки и ограничения
История · было → стало
Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.
Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.