DOI 10.3760/cma.j.cn121094-20240124-00036
[Research on optimization technology of ventilation system in an industrial X-ray inspection workshop].
Аннотация
Objective
To investigate the reasonable airflow organization and exhaust system facilities during the operation of the inspection workshop, and solve the problem of the accumulation of harmful gases such as ozone and nitrogen oxides in the workshop.
Methods
In May 2023, computational fluid dynamics (CFD) technology was used to numerically simulate the diffusion of ozone and nitrogen oxides generated by industrial radiographic inspection operations, and the comparative detection method was used to analyze the ozone and nitrogen oxides concentrations before and after the renovation of the ventilation system of the inspection workshop.
Results
After the renovation of ventilation system, the average concentration of ozone in the inspection workshop decreased from 0.81 mg/m(3) to 0.03 mg/m(3), and the average concentration of nitrogen oxides decreased from 0.42 mg/m(3) to 0.01 mg/m(3), and the differences were statistically significant (t=20.51, 10.38, P<0.001) .
Conclusion
The ventilation facilities of the inspection workshop are set up in the airflow organization mode of sending up and down the exhaust, and the ventilation pipes are scientifically designed through the calculation of ventilation hydraulic balance, which can effectively control the concentration of harmful gases in the inspection workshop.
Предметные рубрики MeSH
Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Ошибки и ограничения
История · было → стало
Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.
Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.