MedElevator Войти в исследования
← Поиск публикаций

DOI 10.1016/j.wasman.2006.12.004

Медицинская библиотека · Waste management (New York, N.Y.) · 2007

Geochemical anomalies from bottom ash in a road construction--comparison of the leaching potential between an ash road and the surroundings.

Lind Bo B, Norrman Jenny, Larsson Lennart B, Ohlsson Sten-Ake, Bristav Henrik

СтатьяПоддержка исследования: вне правительства СШАПеревод в очереди

Аннотация

A study was performed between June 2001 and December 2004 with the primary objective of assessing long-term leaching from municipal solid waste incineration bottom ash in a test road construction in relation to a reference road made up of conventional materials and the natural geochemical conditions in the surroundings. The metal leaching from the test road and the reference road was compared with the natural weathering in the regional surroundings for three time scales: 16, 80 and 1000 years. The results show that Cu and Zn cause a geochemical anomaly from the test road compared with the surroundings. The leaching of Cu from the test road is initially high but will decline with time and will in the long term be exceeded by natural weathering. Zn on the other hand has low initial leaching, which will increase with time and will in the long term exceed that of the test road and the surroundings by a factor of 100-300. For the other metals studied, Al, Na, K and Mg, there is only very limited leaching over time and the potential accumulation will not exceed the background values in a 1000 years.

Для цитирования: Lind Bo B, Norrman Jenny, Larsson Lennart B, Ohlsson Sten-Ake, Bristav Henrik. Geochemical anomalies from bottom ash in a road construction--comparison of the leaching potential between an ash road and the surroundings.. Waste management (New York, N.Y.). 2007. DOI: 10.1016/j.wasman.2006.12.004.

Предметные рубрики MeSH

Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…

История · было → стало

Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.

Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.