MedElevator Войти в исследования
← Поиск публикаций

DOI 10.1016/j.apergo.2011.09.002

Медицинская библиотека · Applied ergonomics · 2011

The effects of safety handrails and the heights of scaffolds on the subjective and objective evaluation of postural stability and cardiovascular stress in novice and expert construction workers.

Min Seung-Nam, Kim Jung-Yong, Parnianpour Mohamad

СтатьяПеревод в очереди

Аннотация

Work performed on scaffolds carries the risk of falling that disproportionately threatens the safety and health of novice construction workers. Hence, objective measures of the postural stability, cardiovascular stress, and subjective difficulty in maintaining postural balance were evaluated for four expert and four novice construction workers performing a manual task in a standing posture on a scaffold with and without safety handrails at two different elevation heights. Based on a multivariate analysis of variance, the experience, scaffold height, and presence of a handrail were found to significantly affect measures of the postural stability and cardiovascular stress. At a lower level of worker experience, a higher scaffold height, and in the absence of a handrail (which may correspond to higher risk of a fall), postural stability was significantly reduced, while cardiovascular stress and subjective difficulties in maintaining postural balance increased. We emphasize the importance of training and handrails for fall prevention at construction sites.

Для цитирования: Min Seung-Nam, Kim Jung-Yong, Parnianpour Mohamad. The effects of safety handrails and the heights of scaffolds on the subjective and objective evaluation of postural stability and cardiovascular stress in novice and expert construction workers.. Applied ergonomics. 2011. DOI: 10.1016/j.apergo.2011.09.002.

Предметные рубрики MeSH

Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…

История · было → стало

Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.

Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.