Hsiao Hongwei, Hause Mathew, Powers John R, Kau Tsui-Ying, Hendricks Scott, Simeonov Peter I
Аннотация
OBJECTIVE: This study determined the most favorable strategy for carrying scaffold end frames while minimizing the risk of injuries from being struck by an object, falling, and overexertion.
BACKGROUND: Scaffold erectors are at risk of high exposure to the aforementioned hazards associated with the dynamic human-scaffolding interface and work environments. Identifying an optimal work strategy can help reduce risk of injuries to the worker.
METHOD: Three carrying methods, four types of work surfaces, two weights of scaffold frames, and three directions of stepping movement were tested in a laboratory with 18 construction workers.
RESULTS: The effects of carrying method on postural instability and task difficulty rating were significant for handling the 22-kg end frame. Response time, postural instability, and perceived task difficulty rating were significantly reduced when the 9-kg end frame was used as compared with the 22-kg frame.
CONCLUSION: The symmetric side-carrying method was the best option for handling 22-kg scaffold end frames. A 9-kg end frame (e.g., made of reinforced lightweight materials) has the potential to reduce injury risk among scaffold handlers during their scaffold erection and dismantlingjobs.
APPLICATION: Scaffold erectors may want to adopt the symmetric side-carrying method as the primary technique for handling the 22-kg scaffold end frame, which is currently the one most used in the industry.
BACKGROUND: Scaffold erectors are at risk of high exposure to the aforementioned hazards associated with the dynamic human-scaffolding interface and work environments. Identifying an optimal work strategy can help reduce risk of injuries to the worker.
METHOD: Three carrying methods, four types of work surfaces, two weights of scaffold frames, and three directions of stepping movement were tested in a laboratory with 18 construction workers.
RESULTS: The effects of carrying method on postural instability and task difficulty rating were significant for handling the 22-kg end frame. Response time, postural instability, and perceived task difficulty rating were significantly reduced when the 9-kg end frame was used as compared with the 22-kg frame.
CONCLUSION: The symmetric side-carrying method was the best option for handling 22-kg scaffold end frames. A 9-kg end frame (e.g., made of reinforced lightweight materials) has the potential to reduce injury risk among scaffold handlers during their scaffold erection and dismantlingjobs.
APPLICATION: Scaffold erectors may want to adopt the symmetric side-carrying method as the primary technique for handling the 22-kg scaffold end frame, which is currently the one most used in the industry.