DOI 10.1016/s0750-7658(97)84272-4
[Quality control of anesthesia equipment after maintenance procedure].
Аннотация
OBJECTIVE
To assess the value of quality control tests after routine maintenance procedures of anaesthesia machines.
STUDY
DESIGN
Prospective laboratory study.
MATERIAL AND
METHODS
Over a 4-year-period, anaesthesia machines were checked after regular maintenance procedures, in order to detect unrecognized dysfunctions before clinical use.
RESULTS
Overall 106 tests were performed on 14 machines and five dysfunctions were identified. Three of them concerned gas proportioning devices, which delivered a hypoxic gas mixture (FO2 < 15%). This defect was recognized by gas analysis at their outlet, whereas mechanical controls were satisfactory. The last two concerned pressure relief valve linearity and gas leak at PEEP valve.
CONCLUSIONS
This study underlines the necessity of both postmaintenance controls and gas analysis at the outlet of the gas proportioning device. These controls should be performed by hospital technicians, independent from those involved in regular maintenance procedures.
Предметные рубрики MeSH
Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Ошибки и ограничения
История · было → стало
Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.
Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.