MedElevator Войти в исследования
← Поиск публикаций

DOI 10.1177/1591019915623558

Медицинская библиотека · Interventional neuroradiology : journal of peritherapeutic neuroradiology, surgical procedures and related neurosciences · 2016

Pipeline embolization device deployment via an envoy distal access XB guiding catheter-biaxial platform: A technical note.

Al-Mufti Fawaz, Amuluru Krishna, Singh Inder Paul, Gandhi Chirag, Prestigiacomo Charles J

Клинический случайСтатьяПеревод пока не подготовлен

Аннотация

With the increased reliance on the Pipeline embolization device (PED) for the treatment of complex intracranial aneurysms, our experience in managing intraoperative complications and challenges continues to accumulate amid a scarcity of reports on rescue strategies and innovative techniques. We describe the case of a 50-year-old woman who presented for elective repeat embolization of a right posterior communicating artery aneurysm with some residual aneurysmal filling. During the procedure the patient developed severe vasospasm due to vessel irritation and this led us to proceed to deploy the PED through a biaxial construct composed of the 6 French Envoy MPD DA XB, and the Marksman catheters. The biaxial construct in select patients may provide the required stability while eliminating the need for an intermediate catheter, minimizing embolic risk, and allowing for less irritation to the vessel. Larger studies are required for further validation.

Для цитирования: Al-Mufti Fawaz, Amuluru Krishna, Singh Inder Paul, Gandhi Chirag, Prestigiacomo Charles J. Pipeline embolization device deployment via an envoy distal access XB guiding catheter-biaxial platform: A technical note.. Interventional neuroradiology : journal of peritherapeutic neuroradiology, surgical procedures and related neurosciences. 2016. DOI: 10.1177/1591019915623558.

Предметные рубрики MeSH

Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…

История · было → стало

Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.

Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.