MedElevator Войти в исследования
← Поиск публикаций

DOI 10.1111/j.1600-0536.2011.02028.x

Медицинская библиотека · Contact dermatitis · 2012

Epoxy pipe relining - an emerging contact allergy risk for workers.

Anveden Berglind Ingegärd, Lind Marie-Louise, Lidén Carola

СтатьяПоддержка исследования: вне правительства СШАПеревод пока не подготовлен

Аннотация

BACKGROUND

Epoxy pipe relining is a method of repairing old and worn water pipes supplying households. The method, using epoxy resin systems (ERSs), involves creating a new pipe inside an existing pipe. Large amounts of epoxy are normally handled at small, temporary worksites.

OBJECTIVES

To describe working conditions and contact allergies to ERSs in 8 patients with occupational contact dermatitis related to their work in the relining trade.

METHODS

Eight patients with suspected work-related eczema in the relining trade were referred to our Occupational and Environmental Dermatology outpatient unit. They were examined and patch-tested between August 2010 and May 2011.

RESULTS

Seven patients were patch test-positive to ERSs, and 6 of 8 reacted to the epoxy resin (MW 340) in the baseline series. Five of the patients were patch test-positive to their own work products. Seven of the cases had to leave the relining trade because of skin problems.

CONCLUSIONS

Relining is a widely used alternative to replacing old pipes, and entails a risk of massive skin exposure to ERSs and consequently a high risk of developing allergic contact dermatitis. Further mapping of working methods and use of personal protective equipment (PPE) is crucial to reduce hazardous skin exposure.

Для цитирования: Anveden Berglind Ingegärd, Lind Marie-Louise, Lidén Carola. Epoxy pipe relining - an emerging contact allergy risk for workers.. Contact dermatitis. 2012. DOI: 10.1111/j.1600-0536.2011.02028.x.

Предметные рубрики MeSH

Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…

История · было → стало

Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.

Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.