Demolition activities in a healthcare facility: results from a fungal surveillance after extraordinary preventive measures.

Troiano G, Sacco C, Donato R, Pini G, Niccolini F, Nante N

СтатьяПеревод пока не подготовлен

Аннотация

OBJECTIVES

Aspergillus spp could be responsible of nosocomial aspergillosis in immunocompromised patients. In 2018, it was decided to demolish a building of Careggi Hospital (Florence, Italy), the Chief Medical Officer ordered a 9-months-long air and surface microbiological sampling and extraordinary preventive measures.

STUDY

DESIGN

A 9-months-long prospective study.

METHODS

After mapping the at-risk areas, air and surface samples were collected in different locations: in corridors, in rooms (high efficiency particulate air filter (HEPA) filtered or not), and outdoors. The samples were collected during the critical phases of the demolition. Air temperature and weather conditions were determined and recorded at the beginning of each sampling.

RESULTS

Seventy-eight air samples and 72 surface samples were collected. The results showed highest contamination at time zero (before extraordinary preventive measures) and in the wards without HEPA filtered air. No specific prophylaxis strategy was implemented at our hospital for immunocompromised patients, and no cases of aspergillosis were recorded.

CONCLUSIONS

Our results showed that extraordinary protective measures, the use of air treatment systems, and a continuous monitoring could be associated with decreased Aspergillus air contamination during construction, renovation, or demolition works.

Для цитирования: Troiano G, Sacco C, Donato R, Pini G, Niccolini F, Nante N. Demolition activities in a healthcare facility: results from a fungal surveillance after extraordinary preventive measures.. Public health. 2019. DOI: 10.1016/j.puhe.2019.07.012.

Предметные рубрики MeSH

Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…

История · было → стало

Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.

Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.