PloS one · 2026
A forecast-to-dispatch workflow for day-ahead operation of a regional natural gas transmission network based on station-level load prediction and linepack target setting.
СтатьяНазвание и аннотация: Перевод пока не подготовлен
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…
Ошибки и ограничения
История · было → стало
Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.
Liu Ying, Xiao Yong, Tang Zhiping, Zhong Simin, Yong Chenguang, Tian Yuanyuan
Аннотация
Day-ahead operation of regional natural gas transmission networks requires station demand forecasts and their translation into inventory-preparation references. This study evaluated a sequential forecast-to-dispatch workflow for the Chongqing regional gas network. Six forecasting models were assessed under a leakage-controlled 30-day walk-forward protocol. Across nine routine stations, mean station-level MAPE was 8.61% for SARIMAX, 8.95% for XGBoost, and 9.78% for GRU. The corresponding values were 10.93% for LSTM, 11.63% for BPNN, and 11.77% for CNN-BiLSTM-Attention. Station G was assessed separately as a data-quality boundary case; Station K was excluded because only 62 observations were available. An independent archived 18-day hourly dataset reported reconstruction MAPE of 6.7%-8.1% and peak-timing deviations of 1.0-1.5 h. A retrospective West-pipeline case for 22 April 2023 traced historical station forecasts through weighted aggregation, intermediate rounding, hourly reconstruction, and reduced-order linepack calculation. Its LFFX preparation target and the separate NGXDD and DLFX targets were 1.272, 4.702, and 1.571 × 10⁶ m³, respectively. All three targets passed case-specific deterministic inventory checks. The results support station-specific forecast-model selection and an explicit interface between daily prediction and segment-level inventory preparation.