MedElevator Войти в исследования
← Поиск публикаций

DOI 10.1016/j.mex.2026.104188

Медицинская библиотека · MethodsX · 2026

A lean-six sigma-ergonomics index for assessing shop-floor operational resilience readiness: Method development and SME demonstration.

Maryadi Deri, Singgih Moses Laksono, Dewi Dyah Santhi

СтатьяПеревод пока не подготовлен

Аннотация

Operational resilience readiness at the shop-floor level depends on efficient process flow, stable quality, and adequate human-system capacity, yet these dimensions are commonly assessed separately. This article presents the Lean-Six Sigma-Ergonomics Operational Resilience Index (LSE-ORI), a non-interventional composite method for assessing manufacturing conditions that support resilience readiness. Process-flow efficiency is represented by Process Cycle Efficiency, quality stability by the actual sigma level normalized against a defined target, and human-system capacity by physical, cognitive, and macroergonomic assessments. The scores are standardized to a 0-1 scale and combined multiplicatively to produce the index and identify the lowest-scoring dimension. A two-month demonstration involving 13 operators on a tractor spare-parts production line yielded scores of 0.60, 0.54, and 0.62, resulting in an ORI of approximately 0.20. Quality stability was the lowest-scoring primary component, while work-system structural support was the weakest subcomponent within the human-system. Content validation by 15 experts across 64 items produced a minimum I-CVI of 0.933 and an S-CVI/Ave of 0.995, supporting applicability, calculation traceability, and content validity. Main advantages of the proposed method: • Integrates three shop-floor dimensions into one assessment. • Uses operational data without changing the production system. Provides hierarchical diagnosis of the lowest-scoring component.

Для цитирования: Maryadi Deri, Singgih Moses Laksono, Dewi Dyah Santhi. A lean-six sigma-ergonomics index for assessing shop-floor operational resilience readiness: Method development and SME demonstration.. MethodsX. 2026. DOI: 10.1016/j.mex.2026.104188.
Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…

История · было → стало

Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.

Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.