MedElevator Войти в исследования
← Поиск публикаций

DOI 10.1016/j.jpurol.2021.08.023

Медицинская библиотека · Journal of pediatric urology · 2021

Implementation and sustainability of an enhanced recovery pathway in pediatric bladder reconstruction: Flexibility, commitment, teamwork.

Chan Yvonne Y, Chu David I, Hirsch Josephine, Kim Soojin, Rosoklija Ilina, Studer Abbey, Brockel Megan A, Cheng Earl Y, Raval Mehul V, Burjek Nicholas E, Rove Kyle O, Yerkes Elizabeth B

СтатьяПеревод в очереди

Аннотация

INTRODUCTION

Although enhanced recovery pathways (ERP) provide a safe and effective way to improve the recovery of children undergoing bladder reconstruction, ERPs have not been widely adopted in pediatric urology. We describe a quality improvement initiative and outcomes after implementing a 24-element ERP at a single, freestanding children's hospital.

STUDY

DESIGN

Multiple stakeholder meetings were planned and executed, initially with pediatric practitioners with ERP experience to understand potential implementation barriers then with anesthesiologists, nurses, case managers, and other ancillary staff to draft our institution-specific ERP. A standardized order set was generated to improve ERP adherence. ERP adherence audits and cyclic performance evaluations held every 6-9 months facilitated continuous pathway refinement. Patient outcomes were compared with a pre-ERP historic cohort.

RESULTS

Time from initial ERP planning to first implementation was 7 months. ERP was implemented in twenty consecutive patients undergoing bladder reconstruction (median age 11.3 years, range 4.1-21.1) who were compared to twenty consecutive pre-ERP patients (median age 11.4 years, range 7.7-25.1). Median post-operative length of stay (LOS) significantly decreased from 9 days (range 2-31) pre-ERP to 4 days (range 3-29) post-ERP (p < 0.05). A median of 16 (range 12-19) of 24 institutional pathway elements were implemented for each patient. Balancing measures showed no significant increases in highest Clavien complication grade, readmission rate, or unplanned return to the operating room within 30 post-operative days.

DISCUSSION: Implementation of ERP is feasible but requires commitment from multi-disciplinary stakeholders. While we were unable to consistently achieve 80% of the elements, we successfully implemented the pathway and improved our patients' recovery processes (indirectly reflected by a decreased post-operative LOS) with adherence to a median of 67% of elements. Our implementation and effectiveness results are specific to our center and may not be generalizable. However, our experience may offer some insight for others interested in ERP implementation and encourage initiation of their own institutional pathways.

CONCLUSION

Successful ERP implementation at our hospital for children undergoing bladder reconstruction was facilitated by open communication, early stakeholder involvement, and monitoring ERP adherence. ERP implementation significantly decreased LOS without increasing post-operative complications and readmissions (Summary figure).

Для цитирования: Chan Yvonne Y, Chu David I, Hirsch Josephine, Kim Soojin, Rosoklija Ilina, Studer Abbey, Brockel Megan A, Cheng Earl Y, Raval Mehul V, Burjek Nicholas E, Rove Kyle O, Yerkes Elizabeth B. Implementation and sustainability of an enhanced recovery pathway in pediatric bladder reconstruction: Flexibility, commitment, teamwork.. Journal of pediatric urology. 2021. DOI: 10.1016/j.jpurol.2021.08.023.

Предметные рубрики MeSH

Подготовка и перевод публикации
Обработка статьи · этапы, ошибки и управление
Загрузка состояния…

История · было → стало

Состояние обновляется каждые 5 секунд, пока блок открыт. Процент показывается только там, где известен объём работы. Пауза останавливает продолжение этапа; текущий запрос к источнику может завершиться.

Тип публикации указан по данным источника. Уровень доказательности автоматически не присваивается.